Intellectual Property
 |
Title: Aircraft
Maintenance Tracking System
Patent No: US 6,418,361 B2
Date of Patent: July 9, 2002
Abstract: An aircraft maintenance tracking system
for tracking aircraft maintenance required on an aircraft
includes means for tracking accumulated usage data of
the aircraft, means for receiving a list of routine tasks
required to be performed on the aircraft, means for tracking
task accomplishment data for each routine task, means
for determining a maintenance due point for each routine
task, means for identifying maintenance due tasks as those
routine tasks for which a difference between the maintenance
due point of the routine task and the accumulated usage
data of the aircraft is less than a user-defined critical
value, and means for reporting maintenance due tasks. |
 |
Title: Maintenance
Tracking System
Patent No: US 6,571,158 B2
Date of Patent: May 27, 2003
Abstract: A maintenance tracking system for tracking
maintenance required on a member of a fleet includes means
for tracking accumulated usage data, means for receiving
a list of routine tasks required to be performed, means
for tracking task accomplishment data for each routine
task, means for determining a maintenance due point for
each routine task, means for identifying maintenance due
tasks as those routine tasks for a which a difference
between the maintenance due point of the routine task
and the accumulated usage data of the aircraft is less
than a user-defined critical value, and means for reporting
maintenance due tasks. |
 |
Title: Dynamic
Aircraft Maintenance Management System
Patent No: US 6,442,459 B1
Date of Patent: August 27, 2002
Abstract: The present invention is a system for
enabling an operator to dynamically manage maintenance
of an aircraft. The system includes a program manager
system, a tracking manager system and a production manager
system. The program manager system is for extracting
maintenance tasks from aircraft maintenance publications,
and for guiding the formation of maintenance task groups.
The tracking manager system is for monitoring accumulated
usage data of the aircraft, and for identifying maintenance
due tasks and maintenance due task groups from the respective
maintenance tasks and maintenance task groups for which
a difference between the control point and the accumulated
usage data is less than a user-defined critical value.
The production manager system is for generating and implementing
a dynamic maintenance flow chart which details scheduling
data for each individual task of the maintenance due tasks
and maintenance due task groups. |
 |
Title: Dynamic
Maintenance Management System
Patent No: US 6,580,982 B2
Date of Patent: June 17, 2003
Abstract: The present invention is a system for
enabling an operator to dynamically manage maintenance
of a member of a fleet. The system includes a program
manager system, a tracking manager system and a production
manager system. The program manager system is for
extracting maintenance tasks from maintenance publications,
and for guiding the formation of maintenance task groups.
The tracking manager system is for monitoring accumulated
usage data of the aircraft, and for identifying maintenance
due tasks and maintenance due task groups from the respective
maintenance tasks and maintenance task groups for which
a difference between the control point and the accumulated
usage data is less than a user-defined critical value.
The production manager system is for generating and implementing
a dynamic maintenance flow chart which details scheduling
data for each individual task of the maintenance due tasks
and maintenance due task groups. |
 |
Title: Aircraft
Maintenance Program Manager
Patent No: US 6,606,546 B2
Date of Patent: August 12, 2003
Abstract: A system for managing an aircraft maintenance
program for an aircraft operated by an operator includes
means for extracting maintenance tasks for the aircraft
from at least one aircraft maintenance document, means
for sorting the maintenance tasks into initial maintenance
task groups having common control points, and means for
guiding the airline operator to organize the maintenance
tasks and initial maintenance task groups into a plurality
of maintenance task groups. |
 |
Title:
Maintenance
Program Manager
Patent No: US 6,598,940 B2
Date of Patent: July 29, 2003
Abstract: A system for managing a maintenance
program includes means for extracting maintenance tasks
for the aircraft from at least one aircraft maintenance
document, means for sorting the maintenance tasks into
initial maintenance task groups having common control
points, and means for guiding the operator to organize
the maintenance tasks and initial maintenance task groups
into a plurality of maintenance task groups. |
 |
Title:
Dynamic Aircraft
Maintenance Production System
Patent No: US 6,671,593 B2
Date of Patent: Dec 30, 2003
Abstract: A dynamic aircraft maintenance production
system for planning a maintenance check of an aircraft
includes means for obtaining any routine tasks that
may exist and which are required to be performed on
the aircraft, means for obtaining any non-routine tasks
that may exist and which are required to be performed
on the aircraft, means for generating a maintenance
flow chart detailing scheduling data for each of the
routine and non-routine tasks, means for assigning a
user-determined number of the routine and non-routine
tasks to personnel for completion, means for maintenance
activity data on each assigned routine task and non-routine
task, means for available resource data, and means for
updating the maintenance flow chart to reflect newly-obtained
maintenance activity date and available resource data. |
 |
Title: Dynamic
Assignment of Maintenance Tasks to Maintenance Personnel
Patent No: US 6,684,136 B2
Date of Patent: Jan 27, 2004
Abstract: A system for assigning maintenance
tasks to crew members of a maintenance crew during a
dynamically-planned maintenance check includes means
for obtaining a dynamic maintenance flow chart detailing
up-to-date scheduling data for a predetermined number
of maintenance tasks, means for obtaining personnel
training records for each crew member, means for determining
maintenance task assignments based upon an analysis
of the maintenance flow chart and the personnel training
records. |
 |
Title: Dynamic
Assignment of Maintenance Tasks to Aircraft Maintenance
Personnel
Patent No: US 6,691,006 B2
Date of Patent: Feb 10, 2004
Abstract: A system for assigning maintenance
tasks to crew members of a maintenance crew during a
dynamically-planned maintenance check for an aircraft
includes means for obtaining a dynamic maintenance flow
chart detailing up-to-date scheduling data for a predetermined
number of maintenance tasks, means for obtaining personnel
training records for each crew member, means for determining
maintenance task assignments based upon an analysis
of the maintenance flow chart and the personnel training
records. |
 |
Title: Aircraft
Maintenance Program Manager
Patent No: US 6,795,758 B2
Date of Patent: Sept 21, 2004
Abstract: A system for managing an Aircraft maintenance
program for an aircraft operated by an operator includes
means for extracting maintenance tasks for the aircraft
from at least one aircraft maintenance document, means
for sorting the maintenance tasks into initial maintenance
task groups having common control points, and means
for guiding the airline operator to organize the maintenance
tasks and initial maintenance task groups into a plurality
of maintenance task groups. |
 |
Title: Dynamic
Maintenance Production System
Patent No: US 6,826,461 B2
Date of Patent: Nov 30, 2004
Abstract: A dynamic maintenance production system
for planning a maintenance check includes means for obtaining
any routine tasks that may exist and which are required
to be performed, means for obtaining any non-routine tasks
that may exist and which are required to be performed,
means for generating a maintenance flow chart detailing
scheduling date for each of the routine and non-routine
tasks, means for assigning a user-determined number of
the routine and non-routine tasks to personnel for completion,
means for obtaining maintenance activity data on each
assigned routine task and non-routine task, means for
obtaining available resource data, and means for updating
the maintenance flow chart to reflect newly-obtained maintenance
activity data and available resource data. |
 |
Title: Dynamic Management
of Aircraft Part Reliability Data
Patent No: US 7,167,786 B2
Date of Patent: Jan. 23, 2007
Abstract: A system for recording and analyzing reliability
data for an aircraft during a dynamically-planned maintenance check
of the aircraft includes means for obtaining and logging
warranty-based reliability data from maintenance records generated
during the performance of any routine or non-routine tasks that may
exist, and which pertain to rotable parts of the aircraft; means for
obtaining and logging maintenance program-based reliability data from
maintenance records generated during the performance of any
non-routine tasks that may exist: means for identifying for each
non-routine task, a routine task whose performance resulted in the
generation of the non-routine task; means for obtaining and logging
maintenance program-based reliability data from maintenance records
generated during the performance of any identified routine tasks that
may exist; and means for analyzing and reporting the warranty-based
reliability data and the maintenance program-based reliability data. |
|
|